Files
gitmost/.github/workflows/test.yml
claude_code 0caceb614b
Some checks failed
Test / test (pull_request) Has been cancelled
ci: gate develop & release image builds on the test suite
The Docker-image builds ran independently of the Test workflow, so a
failing test would not block publishing the :develop image (or a
release). GitHub Actions `needs:` only works within one workflow, so the
two separate workflows didn't depend on each other.

Make test.yml a reusable workflow (workflow_call) and call it from
develop.yml and release.yml as a `test` job that `build` depends on
(`needs: test`); release's `release` job already needs `build`, so it
waits transitively. test.yml keeps its pull_request trigger for PR
gating; its redundant push:develop trigger is dropped (develop.yml now
calls it on push).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-21 01:17:27 +03:00

41 lines
850 B
YAML

name: Test
on:
pull_request:
workflow_call:
workflow_dispatch:
concurrency:
group: test-${{ github.ref }}
cancel-in-progress: true
permissions:
contents: read
jobs:
test:
runs-on: ubuntu-latest
steps:
- name: Checkout
uses: actions/checkout@v4
- name: Set up pnpm
uses: pnpm/action-setup@v4
- name: Set up Node
uses: actions/setup-node@v4
with:
node-version: 22
cache: pnpm
- name: Install dependencies
run: pnpm install --frozen-lockfile
# Required for the client suite, which resolves @docmost/editor-ext via its
# dist build (the server suite also rebuilds it through its own pretest).
- name: Build editor-ext
run: pnpm --filter @docmost/editor-ext build
- name: Run tests
run: pnpm -r test